November 2026 Updated Maize Aflatoxin Protocol
At a Glance
-
AIC and other scheme owners have revised the Maize Aflatoxin Protocol to recognise contamination risks from the 2026 European maize harvest, following record breaking temeratures and drought across large parts of the continent.
-
The revised protocol comes into effect as soon as possible, but no later than 27 November 2026
-
Key Changes:
-
France (North) risk rating LOW → MEDIUM
-
Full Briefing Below
November 2026 Updated Maize Aflatoxin Protocol
AIC, working alongside scheme owners EFISC-GTP (European Feed and Food Ingredient Safety Certification – Good Trading Practice), GMP+ International, OVOCOM, and QS, has revised the Maize Aflatoxin Protocol as follows:
-
France (North) risk rating LOW → MEDIUM
The new risk ratings must be implemented no later than 27 November 2026, however Participants should consider whether additional measures are required to ensure safety and legal compliance of feed during the transition period.
Traceability and Analysis Requirements
As result of these changes, the frequency of analysis for Aflatoxin B1 in maize originating from France (North) must be increased as a minimum in line with the requirements set out in the Protocol. Participant’s own risk assessment may indicate higher levels of analysis are required for these and other origins. In addition, all consignments of maize from countries rated as HIGH or MEDIUM must be supplied to ciustomers with valid aflatoxin results in accordance with the protocol.
The whole of France now has a Medium Aflatoxin Risk rating, however Participants are required to continue to distinguish between Northern and Southern France to allow accurate regional risk assessments to continue.
The updated Maize Aflatoxin Protocol can be downloaded here.